-
E-mail: yidek@126.com
-
Tel: 400-8262-889
-
Fax: 0577-85600699
-
Contact: Mr. Ji
Contact Us
Problem
Debugging the suction problem - the capacitor is put into operation when there is no load in the panel factory?
Datetime: 2018-07-28 Visit: 4058
When the panel factory is commissioned without a load, the capacitor is put into operation?
answer:
Reason: The transportation process causes the internal switching switch to jump to the closed state, and the capacitor is powered on. Solution: Ensure that the product is powered on for 30s, and the capacitor will
Automatic removal.